top of page
3.png

OUR COMPLETED PROJECTS

We Build Projects
That Last

IN PROGRESS

Hyundai Motors India Pune

Hyundai Motors India Pune

Location: Pune, India

Owner: Hyundai Motors

General Contractor: HEIN Global Utama

AEI Scope:

Retrofit of existing GM factoryAdditional HV & LV substationsNew 220kV substationPCC Panels

Screenshot 2024-12-13 at 10.56.39 AM.png

Major U.S. Camp Projects by AEI

Osan Airbase

Location: Osan, South Korea

AEI Scope:  38kV & 15kV switchgear supply, Eaton GOMNY01727

Owner: United States Air Force

General Contractor:

download-5.png
Screenshot 2024-12-13 at 11.39.58 AM.png

USAG - Camp Humphreys

Location: Pyeongtaek, South Korea

AEI Scope: Outdoor Metal Clad & Pad-Mounted Switchgear,Pad-Mounted Junction Box

Owner: United States Army FED

General Contractor: SK Engineering and Construction

download-5.png
Screenshot 2024-12-13 at 11.39.58 AM.png

USAG - Camp Henry

Location: Daegu, South Korea

AEI Scope: Outdoor Pad Mounted Switchgear

Owner: United States Army

General Contractor: Newallin D&C

download-5.png
Screenshot 2024-12-13 at 11.39.58 AM.png
Screenshot 2024-12-13 at 11.40.42 AM.png
USAGH-CREST.jpg
USAGH-CREST.jpg

USAG - Camp Caroll, THADD

Location: Daegu, South Korea

AEI Scope: EATON GO-ITEM: MNY001201327KV SWGR 

Owner: United States Army

General Contractor: Newallins

Screenshot 2024-12-13 at 11.57.05 AM.png

USAG - Camp Walker

Location: Daegu, South Korea

AEI Scope: Outdoor Mounted Switchgear

Owner: United States Army

General Contractor: Limkwang Construction

Screenshot 2024-12-13 at 11.57.19 AM.png
USAGH-CREST.jpg
bottom of page